Areva Electric (Suzhou) Co., Ltd

Areva Electric (Suzhou) Co., Ltd

Leading Enterprise in the Electrical Industry

Industrial IoT electrical leader

Industrial IoT electrical leader

Efficient management, intelligent insight, safety and reliability

Responsible for professional speed

Responsible for professional speed

24-hour technical support<400-879-1928>

Big data cloud services are within reach

Big data cloud services are within reach

AREVE Electric


Suzhou AREVE Electric Co., Ltd. is located in Suzhou High-tech Development Zone with a registered capital of 30.8 million Yuan. It is a Sino-foreign joint venture company specializing in the production of high-voltage transmission and distribution switchgear. 

know us >

Classic Cases

Product applications cover the transmission and distribution and power consumption fields

Download

Find and download the product documentation, technical support you need


Solution of SF6 densimeter without disassembly and calibration (SF6 three-way valve)

Requirements for SF6 densitometer in the operation regulations of the State Grid, DL/T596-1996 Preventive Test Procedures for Electric Power Equipment implemented by the Ministry of Electric Power on January 1, 1997: "SF6 gas densitometer (including setting value) inspection" is included in the No. 13 of the "switchgear" section. The test time required in the regulations is 1-3 years, after major repair or when necessary, the specific calibration time is formulated by the pilot plants in each province, and it is generally appropriate to calibrate at least once every 3 years, It is applicable to high voltage circuit breakers and combined circuit breaker GIS of ABB, Siemens, Schneider, Areva and other brands. 1. Current routine calibration

2018/08/29

Manufacturing and debugging process of electric control system

3. Making the control cabinet and on-site construction 1) When making the control cabinet, the engineer shall first draw the power incoming wiring diagram of the PLC and the power supply wiring diagram of the output actuator; 2) Draw the layout of components in the electrical cabinet and the mutual wiring diagram; Draw the layout of control panel components. 3) If the power supply of PLC has interference, filter and isolation transformer shall be set. In addition, the engineer shall separate the signal line, power line and power line and use trunking or metal pipe for wiring. 4) Special attention shall be paid to the safe, correct, reliable, reasonable and beautiful installation, and the grounding of PLC shall be properly handled, and the anti-interference ability of the system shall be improved

2018/08/29

AREVA passed the CQC audit and certification

AREVA passed the CQC audit and certification

2018/09/09

Welcome European team visit Suzhou Factory

Welcome European team visit Suzhou Factory

2018/09/25


Our Clients


AREVE Electric is the brand you can trust for long-term performance-proven transmission and distribution system solutions!

Client
Client
Client
Client
Client
Client
Client
Client
Client